- Product Categories
- Friendly Links
| Information Name: | Friends wins reducer blender |
| Published: | 2015-04-14 |
| Validity: | 180 |
| Specifications: | |
| Quantity: | 100.00 |
| Price Description: | |
| Detailed Product Description: | A, A, stirring device installer 1. channel wells and install bottom shelf or cover flange (when using the kettle type tank) fixed connection (Note: Install the bottom level of the connection must be maintained). 2. Place the mixing shaft into the slot in vivo (if agitator shaft is multistage, according to installation site can be segmented into a stirring shaft or connected as a whole after placed.) 3. Detach gearbox bracket (if installed , gear rack is connected as one to perform this step; otherwise, this step is omitted). 4. After the first step of the installation bracket and mounting undercover fixed. 5. stirring shaft and bracket: rack connection with a double pivot (SJ type), dual fulcrum pivot bracket structure Installation Preparation: lower fulcrum built-aligning bearing on tight sets with self-aligning bearing, adapter sleeve with nut interlocking pieces, bearing bore tapered loading steps: ① the fulcrum under the following closures open the sealed cover will cover the agitator shaft. ② At this point, you can see a band adapter sleeve aligning bearings, the adapter sleeve nut and loosen the tight sets about to leave the extent but not completely out. B, the fulcrum Installation Preparation: The fulcrum is 45 # steel sleeve with keyway on the inner sleeve hole (until the next pivot bearing is ready, stir the bottom up through the shaft sleeve wear it). C, A and B, after preparing a two-step, with the stirring shaft hoisting tools hanging through two pivot bearing bracket. After hoisting in place, then the pivot above the nut, the nut under the pivot turn lock with locking tabs, the last Shang Hao closures can be. (2) with a single pivot (DJ-type) connected to the frame: Bracket fulcrum Description: fulcrum 45 # steel sleeve, the sleeve bore with keyway; Preparations: The agitator shaft key pivot bushing and bracket keyway aligned on a straight line; installation: 1, the bottom-up through the agitator shaft sleeve; 2, the agitator shaft head through the round nut washers through the round nuts, round nuts tighten the washers and circular grooves on the nut fully corresponding teeth (at least one), fixed bend in the recess to play a round nut locking locking effect. 1. Place a rack gear winched to the top: ① with stirring shaft couplings connecting the gear output shaft and fixed; ② the gearbox connected and fixed to the frame. 2. Install under stirring shaft axis (if there is one and not integrally connected with the upper shaft.). 3. Install the agitator (detachable): ① the sleeve onto the agitator shaft, with the top screw fastening. ② The label on the agitator blade stirrer and factory bushings (if labeled) corresponding, and bolted tight. 4. installed. A, B, install the technical requirements of the horizontal deviation of the end face of the gasket on the rack is not greater than 0.15mm. 2, stirring shaft entrance tank top horizontal wells sub-beam surface deviation is less than 1.2mm. 3, after mixing system installation is complete, the manual plate car, stirring shaft is not greater than the lower radial swing 1.0-1.5mm. 4, viewed from above rotates clockwise, not reversed; otherwise, you should stop and check off immediately adjust the power connection. 5, stirring device after installation, manual plate car, should not jam, collisions, and so the resistance is too large, then filled with water at least 1 hour trial run, no abnormal vibration and noise, motor and reducer should be no abnormal fever phenomenon. 6, must be strictly in accordance with the manual gearbox lubricating and regular oil changes. Second, the use and maintenance of a stirring device, using the process to check gear bracket bearing note any abnormal sound at any time, if found please identify the reasons for abnormal sound, repair and maintenance. 2, periodically check the gear output shaft seal, bearing seals working conditions, whether oil spills, oil leakage phenomenon. In accordance with the instructions to replace the internal gear reducer chassis lubricants, winter winter oil should be replaced. 3, regular inspection and tightening bolts blender wear loose phenomenon. 4. Operation NOTE: When operating, the need to be careful not to start the motor when the mixing blades Buried in the solid phase sediment layer. If a sudden power outage caused agitator stopped for a period of time or a long time, stirring blades Buried in solid sediment layer, not directly start the motor manually jigger, or take other methods to make up after a solid layer of suspension, then start the motor, otherwise, would result in damage to the motor, reducer and other key components a rack in the top slot jingzi beam in place, the end face of the relevant parts of the pad next appropriate thickness |
Admin>>>
You are the 16101 visitor
Copyright © GuangDong ICP No. 10089450, Friends wins Zibo Chemical Equipment Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 16101 visitor
Copyright © GuangDong ICP No. 10089450, Friends wins Zibo Chemical Equipment Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
| No.13690984

